Toowoomba Second 
Range Crossing

  • Project vision:

    Mt Kynoch potable water required a reliable transport vessel that enabled increased volume to support the ongoing water supply to Toowoomba City. A redundancy pipe also needed to be installed as a backup.

  • Interesting facts:

    We partnered with Newlands Group and the Toowoomba Region to bring an engineered to order solution for the $1.606 billion Toowoomba Second Range Crossing.

  • How we helped:

    • 1283 & 559 OD steel water main welded inside and out.
    • 100% Visual examination IAW AS/NZS 1554.
    • Over 100 welds across 800m of pipeline in various landscapes including bridge crossover.
    • Completed within a 24 hour critical cut over time.